Rail lifting clamp HPX

HPX Dedicated SP100 Rail Lifting Clamp (2,000 kg WLL)

WLL: 2000 kg
For rails: SP100

£698.52
Quantity
  Last items in stock

1 pcs
£838.22 tax incl.
£698.52 tax excl.
Lead time 1-30 days if in stock Lead time: 14-30 days if not in stock

Discount for logged-in customers - 5%

FREE SHIPPING FOR ORDERS OVER £300

 

HPX Dedicated SP100 Rail Lifting Clamp (2,000 kg WLL)

Enhance the precision and safety of your specialised rail infrastructure projects with the HPX Rail Lifting Clamp. Engineered specifically for networks that utilize the SP100 track profile, this dedicated lifting attachment guarantees a secure, perfectly balanced, and zero-compromise mechanical grip.

Delivering a highly capable Working Load Limit (WLL) of 2,000 kg (2 Tonnes), the HPX model provides rail contractors and track maintenance crews with a robust, heavy-duty rigging solution tailored exactly to the dimensions of SP100 rail sections.

Core Operational Advantages

Lifting 2 tonnes of solid steel requires equipment that delivers absolute mechanical certainty. The HPX is purpose-built to provide targeted performance for specific rail networks while integrating seamlessly with your existing rigging gear:

  • Exclusive SP100 Profile Match: The clamping jaws are custom-machined explicitly for the specific head dimensions of the SP100 rail. This bespoke, interlocking fit ensures an aggressive mechanical bite, preventing lateral slip and dangerous load shifts during overhead transit.
  • 2-Tonne Payload Capacity: Rated to safely manage up to 2,000 kg, providing ample lifting strength to easily accommodate extended standard lengths and heavy sections of solid steel track.
  • Modular Rigging Integration: Supplied as a standalone heavy-duty clamp, the HPX allows your riggers to connect it directly to their own certified master links, chain slings, or multi-point spreader beams for ultimate operational flexibility.
  • Premium Industrial Craftsmanship: Forged from exceptional-grade industrial steel, it is built to withstand relentless exposure to harsh weather, heavy impacts, and severe track ballast friction.

Absolute Safety & Mandatory Proof Testing

In the high-stakes environment of the UK rail network, equipment failure is simply not an option. We provide indisputable proof of structural integrity before the clamp ever reaches your trackside operations:

Zero Guesswork – 100% Strength Tested: At Craneplex, we refuse to rely on randomized batch checks. Every single HPX rail clamp undergoes a rigorous 100% physical strength proof load test in strict accordance with the appendices of the BS EN 13155 standard. Your exact unit has been physically overloaded in a controlled factory setting to empirically prove it will not deform under its maximum 2-tonne capacity.

To guarantee seamless passage through the strictest Health and Safety Executive (HSE) site audits, the HPX satisfies all critical statutory frameworks:

  • UKCA Certified: Fully approved, documented, and regulatory-ready for safe commercial deployment across Great Britain’s rail network.
  • Statutory Machinery Laws: Strictly adheres to all mandatory health, safety, and lifting directives outlined in the UK Supply of Machinery (Safety) Regulations 2008.
  • Harmonised Lifting Standards: Designed, manufactured, and physically tested in absolute alignment with the harmonised BS EN 13155 (Cranes – Safety – Non-fixed load lifting attachments) standard.

HPX.jpg     

Code WLL
[kg]
Aclose
[mm]
Aopen
[mm]
H
[mm]
C
[mm]
D
[mm]
E
[mm]
F
[mm]
Imin
[mm]
Imax
[mm]
J
[mm]
Mass
[kg]
HPX 2.0 2000 148 203 246 43 17,5 40 16 58 108 100 11

Order & Technical Enquiries

Equip your infrastructure teams with precision-engineered rail clamps that guarantee a perfect grip on SP100 profiles, substantial 2-tonne lifting capacity, and complete site compliance.

To order the HPX Rail Lifting Clamp, request formal dimensional schematics, or discuss bulk requirements for your upcoming major rail project, please contact our expert team today: sales@craneplex.co.uk

Frequently Asked Questions (FAQ)

Q: Can I use the HPX clamp to lift other rail types like BS113A or UIC60?
A: No. The HPX is a bespoke model with jaw geometry machined exclusively for the SP100 rail profile. Using it on differently shaped rail heads will result in an insecure grip, creating a severe and immediate safety hazard on your site. If you need a clamp for multiple profiles, please view our multi-profile models.

Q: Is a chain sling included with this clamp?
A: No, the HPX is supplied as a standalone clamp. This design allows you to pair it with your own highly-rated, 2-tonne certified rigging gear, giving your lifting team the flexibility to configure the load path to suit your specific crane setup.

Q: What is the benefit of a dedicated profile clamp?
A: By using a clamp engineered specifically for the SP100 rail profile, you eliminate any potential slop or misalignment in the jaw mechanism. It offers an optimized, zero-compromise mechanical lock on that specific rail head, maximizing stability during heavy lifts.

Q: How does the "100% strength test" help my site managers during HSE inspections?
A: It provides them with a physical, documented test certificate confirming that your exact serial-numbered lifting clamp has survived extreme overload testing at the factory. This provides HSE inspectors with undeniable proof that the equipment is structurally sound and fit for high-capacity use on a live railway network.

Product Details

HPX 2.0
1 Item

grade FREE SHIPPING FOR ORDERS OVER £300 (UK MAINLAND)

THERE IS A HANDLING CHARGE OF £20 FOR ORDERS UP TO £300

(This is for the preparation of the products for shipment and delivery)


loyalty DISCOUNTS FOR THIS PRODUCT

• 5% discount for logged-in customers       

The discount will be automatically applied to your cart. Does not apply to products on sale.


* TRANSPORT

The stated lead time depends on the parameters of the device. The delivery time depends on the size and the time needed to manufacture the device. The exact delivery time is determined after the order has been placed. If the lead time needs to be accelerated, we can offer express delivery after prior agreement on delivery and cooperation. For an extra charge, direct transport from the manufacturer's warehouse to the customer's warehouse or to any other location indicated is possible. This helps speeds up delivery times.

Product Comments

Comments (0)