Coil tongs CH-P D-H-M - with regulation
WLL: 30 000 kg
ASK ABOUT PRICE
- ASK ABOUT PRICE
WLL: 2000 kg
For rails: S49, R50, S54, UIC54, S60, UIC60
![]()
Transform the safety and efficiency of your track preparation and maintenance with the highly specialised HPU Rail Turning Clamp. Unlike standard vertical lifting clamps, the HPU is explicitly engineered with a unique gripping geometry designed to safely grip, lift, and axially rotate heavy steel rail sections into their correct operational orientation.
Delivering a robust Working Load Limit (WLL) of 2,000 kg (2 Tonnes), the HPU provides trackside engineers and depot operators with a dedicated rigging solution to manage the notoriously dangerous task of flipping or turning heavy, unstable rail profiles.
Rotating tons of solid steel along its longitudinal axis requires equipment that delivers an absolute, failsafe mechanical bite from multiple angles. The HPU is purpose-built for controlled rail manipulation:
In the high-stakes environment of the UK rail network, equipment failure during a complex turning operation is catastrophic. We provide indisputable proof of structural integrity before the clamp ever reaches your trackside operations:
Zero Guesswork – 100% Strength Tested: At Craneplex, we refuse to rely on randomized batch checks. Every single HPU turning clamp undergoes a rigorous 100% physical strength proof load test in strict accordance with the appendices of the BS EN 13155 standard. Your exact unit has been physically overloaded in a controlled factory setting to empirically prove it will not deform under its maximum 2-tonne capacity.
To guarantee seamless passage through the strictest Health and Safety Executive (HSE) site audits, the HPU satisfies all critical statutory frameworks:
| Code | WLL [kg] |
A [mm] |
H [mm] |
C [mm] |
D [mm] |
E [mm] |
F [mm] |
I [mm] |
J [mm] |
Mass [kg] |
| HPU 2.0 | 2000 | 86 | 239 | 42 | 13 | 48 | 13 | 23 | 50 | 3,4 |
Equip your rail handling teams with heavy-duty turning clamps that guarantee an absolute grip during rotation, exceptional lifting strength, and complete site compliance.
To order the HPU Rail Turning Clamp, request formal dimensional schematics, or discuss bulk requirements for your upcoming major rail project, please contact our expert team today:
Q: What is the main difference between a standard lifting clamp and this turning clamp?
A: Standard lifting clamps (like the HPB or HPG) are designed only for keeping a rail perfectly vertical during a lift. If the rail shifts or rotates, a standard clamp can lose its grip. The HPU Turning Clamp has a specifically engineered jaw that locks securely onto the rail head, allowing it to be safely flipped or rotated along its axis without slipping.
Q: Can I use this clamp to pull the rail horizontally?
A: No. While the HPU is designed for lifting and rotation, it is not calibrated for dragging or horizontal track stressing. If you need to pull or tension a rail horizontally, you must use a dedicated pulling clamp, such as our HPR or HPT models.
Q: Does this clamp handle the heavy UIC60 rails safely during a turn?
A: Yes. The HPU's jaw geometry is engineered and certified to safely grip, lift, and rotate heavy UIC60 rail profiles, as well as several other standard types like S49 and UIC54.
Q: How does the "100% strength test" help my site managers during HSE inspections?
A: It provides your safety officers with a physical, documented test certificate confirming that your exact serial-numbered clamp has survived extreme overload testing at the factory. This provides HSE inspectors with undeniable proof that the equipment is structurally sound and fit for complex manipulation on a live railway network.
grade FREE SHIPPING FOR ORDERS OVER £300 (UK MAINLAND)
THERE IS A HANDLING CHARGE OF £20 FOR ORDERS UP TO £300
(This is for the preparation of the products for shipment and delivery)
loyalty DISCOUNTS FOR THIS PRODUCT
• 5% discount for logged-in customers
The discount will be automatically applied to your cart. Does not apply to products on sale.The stated lead time depends on the parameters of the device. The delivery time depends on the size and the time needed to manufacture the device. The exact delivery time is determined after the order has been placed. If the lead time needs to be accelerated, we can offer express delivery after prior agreement on delivery and cooperation. For an extra charge, direct transport from the manufacturer's warehouse to the customer's warehouse or to any other location indicated is possible. This helps speeds up delivery times.
WLL: 500 - 1 000 kg
Capacity (number of people): 2 - 4
WLL: 1 000 kg
For crane rails: A100
WLL: 2 000 kg
For rails: S49
WLL: 1500 kg
Gripping range: 500 - 850 mm
WLL: 3000 - 8000 kg
Gripping range: 500 - 950 mm
WLL: 1500 kg
Gripping range: 500 - 850 mm
WLL: 3000 - 8000 kg
Gripping range: 500 - 950 mm
WLL: 2000 kg
For rails: S49, R50, S54, UIC54, S60, UIC60
Product Comments
Your review appreciation cannot be sent
Report comment
Report sent
Your report cannot be sent